Tracks
Tararua main ridge
A Total Tararua Traverse
Track
• 8 – 16 days. Medium. One way.
The length of the Tararuas via the pointy bits, from the Manawatu Gorge at Woodville to the Rimutaka Hill Road summit.
A true watershed traverse would head from Punga Hut over Ngawhakarara to t...
Waiohine Pinnacle track
Track
• Medium/hard. Return by the same track.
Gives access from Arete Forks to Waiohine Pinnacles on Tarn Ridge
Ascends Pinnacle Spur from the Arete Stream Junction
Track grades
- Easy
- Unusually smooth, well-marked track, easy gradients. Up to about 4 hours per day.
- Easy-medium
- Typical lowland track. Generally easy walking and well marked. Ascents of up to 1000m. Some easy river crossings, unmarked travel along rivers.
- Medium
- Typical tops track. Experienced trampers only. Rough, muddy and poorly marked or unmarked. Ascents of up to 2000m. River crossings, open tops, passes. Up to about 8 hours per day.
- Medium-hard
- Navigation and snow skills (use of ice axe and crampons) required. Glaciers, exposure to falls.
- Hard
- Rough or non-existent tracks. Following ridges, bush spurs, and rivers. Steep ascents, arduous travel, hazardous conditions, snow and navigation skills essential.