Alert |
Torrent Bay High Tide Track and Cleopatras Pool Track closures
The Torrent River bridge is scheduled to be constructed in May 2024. Due to the confined working space at the bridge site, the Cleopatras Pool Track and Torrent Bay High Tide Track will be closed for visitor safety from Monday 13 May 2024 – Friday 24 May 2024. There may be a two-week … until Friday 7 June 2024 if the project is delayed due to weather. There may be a two-week extension through until Friday 31 May if the project is delayed due to weather. Walking access between Anchorage and Torrent Village will only be possible using the Low Tide track within two hours either side of low tide. Plan your trip around the tide. First published on 7 March 2024. |
Date | 5 May 2024 16:42 |
Source | Crown Copyright: Department of Conservation Te Papa Atawhai 2024. |
For | Bark Bay Hut |
---|---|
Alert |
Torrent Bay High Tide Track and Cleopatras Pool Track closures
The Torrent River bridge is scheduled to be constructed in May 2024. Due to the confined working space at the bridge site, the Cleopatras Pool Track and Torrent Bay High Tide Track will be closed for visitor safety from Monday 13 May 2024 – Friday 24 May 2024. There may be a two-week … until Friday 7 June 2024 if the project is delayed due to weather. There may be a two-week extension through until Friday 31 May if the project is delayed due to weather. Walking access between Anchorage and Torrent Village will only be possible using the Low Tide track within two hours either side of low tide. Plan your trip around the tide. First published on 7 March 2024. |
Date | 5 May 2024 16:44 |
Source | Crown Copyright: Department of Conservation Te Papa Atawhai 2024. |